To provide technical education for students with advance technology in mechanical engineering.
Sr.No. | LAB NAME | COST |
---|---|---|
1 | CAD CAM LAB | 3,62,360/- |
2 | THERMAL ENGINEERING LAB | 1,49,700/- |
3 | MEASUREMENT & CONTROL LAB | 1,40,000/- |
4 | THEORY OF MACHINE LAB | 1,33,900/- |
5 | METROLOGY & QUALITY CONTROL LAB | 4,11,100/- |
6 | INDUSTRIAL FLUID POWER LAB | 1,97,625/- |
7 | AUTOMOBILE ENGINEERING LAB | 1,97,625/- |
8 | POWER ENGINEERING LAB | 1,96,870/- |
9 | MECHANICAL ENGINEERING MATERIALS | 1,83,120/- |
NAME OF LAB: | CAD-CAM Lab |
NAME OF LAB INCHARGE: | Mr Mungle N A |
NAME OF TECHNICAL ASSISTANT: | Mr Wangaskar R U |
TOTAL COST OF LAB: | 3,62,360/- |
CARPET AREA: | 66 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
---|---|---|---|---|---|
1 | LCD Monitor | 20 | 433/20-09-2011,1079/09-10-2013 | 3 | 90,000 |
2 | Key Board | 20 | 433,412/20-09-2011,1079/5-10-2016 | 4 | 6,680 |
3 | Mouse | 20 | 433,412/20-09-2011, 5-10-2016 | 5 | 3,680 |
4 | Cabinet | 20 | 433/20-09-2011,09-10-2013 | 6 | 50,000 |
5 | CPU Processor (IntelDual Core3.0 GHZ) | 20 | 433/20-09-2011,09-10-2013 | 7 | 1,16,000 |
6 | Hard Disk (250 GB barracuda seagate) | 20 | 433/20-09-2011,09-10-2013 | 8 | 36,000 |
7 | Ram(DDR3 2 GB Hynet) | 20 | 433/20-09-2011,09-10-2013 | 9 | 30,000 |
8 | Mother Board(AsRock DG 31) | 20 | 433/20-09-2011,09-10-2013 | 10 | 56,000 |
NAME OF LAB: | Thermal Engineering Lab |
NAME OF LAB INCHARGE: | Mr. Nitlikar P S |
NAME OF TECHNICAL ASSISTANT: | Mr Suryawanshi Rohan |
TOTAL COST OF LAB: | 1,49,700/- |
CARPET AREA: | 72 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 |
Steam Boiler Models |
3 |
ME/2014/12/7771/ 21/12/2014 |
1 |
34,100 |
2 |
Cut Section Models Of SteamTurbine |
2 |
ME/2014/12/7771/ 21/12/2014 |
2 |
13,400 |
3 |
Steam Condenser Model |
2 |
ME/2014/12/7771/ 21/12/2014 |
3 |
17,400 |
4 |
Boiler Mountings |
4 |
ME/2014/12/7771/ 21/12/2014 |
4 |
20,700 |
5 |
Boiler Accessories |
1 |
ME/2014/12/7771/ 21/12/2014 |
5 |
20,700 |
6 |
Heat Exchanger Models |
2 |
ME/2014/12/7771/ 21/12/2014 |
6 |
16,700 |
7 |
Thermal Conductivity Of Metal Rods |
1 |
ME/2014/12/7771/ 21/12/2014 |
7 |
26,700 |
TOTAL COST | 1,49,700/- |
NAME OF LAB: | MEASUREMENT & CONTROL LAB |
NAME OF LAB INCHARGE: | Mr. Waghmare V P |
NAME OF TECHNICAL ASSISTANT: | Mr Mulani A M |
TOTAL COST OF LAB: | 1,40,000/- |
CARPET AREA: | 72 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
---|---|---|---|---|---|
1 | Temperature Transducer Trainer | 1 | MS/01/15-16/657/15-07- 2015 | 9 | 12,450 |
2 | Linear Variable Differential Transducer (LVDT) | 1 | MS/01/15-16/657/15-07- 2015 | 10 | 9450 |
3 | Capacitive Water Level Transducer | 1 | MS/01/15-16/723/27-07- 2015 | 11 | 8900 |
4 | Strain Gauge Trainer | 1 | MS/01/15-16/723/24-07- 2015 | 12 | 8250 |
5 | Rota meter | 1 | MS/01/15-16/238/15-07- 2015 | 13 | 27,000 |
6 | Speed Measurement Stroboscope | 1 | MS/01/15-16/657/26-08- 2015 | 14 | 10,850 |
7 | Frequency Modulation | 1 | 1050/15/7/2015 | 15 | 8500 |
8 | Mini Process Control Demonstrator | 1 | 1050/15/7/2015 | 16 | 40,800 |
9 | Dual Power Supply(20-30 V,2A) | 1 | MS/01/15-16/657 | 17 | 13,800 |
TOTAL COST | 1,40,000/- |
NAME OF LAB: | THEORY OF MACHINE LAB |
NAME OF LAB INCHARGE: | Mr.Sabde A.M. |
NAME OF TECHNICAL ASSISTANT: | Mr Wangaskar R U |
TOTAL COST OF LAB: | 1,33,900/- |
CARPET AREA: | 72 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Model Of Machine Mechanism | 8 | 7771/ 21/12/2014 | 21 | 44,600 |
2 | Cam and Follower Model | 5 | 7771/ 21/12/2014 | 22 | 12,700 |
3 | Governor Model | 2 | 7771/ 21/12/2014 | 23 | 35,400 |
4 | Balancing Machine | 1 | 7771/ 21/12/2014 | 24 | 22,700 |
5 | Mechanically Operated Break Model | 3 | 7771/ 21/12/2014 | 25 | 11,100 |
6 | Belt Models | 2 | 7771/ 21/12/2014 | 26 | 7400 |
TOTAL COST | 1,33,900/- |
NAME OF LAB: | METROLOGY & QUALITY CONTROL LAB |
NAME OF LAB INCHARGE: | Mr. Waghmare V P |
NAME OF TECHNICAL ASSISTANT: | Mr Mulani A M |
TOTAL COST OF LAB: | 4,11,100/- |
CARPET AREA: | 72 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Radius Gauge | 1 | RDKP/1516/0006/18-07- 2015 | 2 | 1200 |
2 | Pillar Gauge | 1 | RDKP/1516/0006/18-07- 2015 | 3 | 1200 |
3 | Screw Pitch Gauge | 1 | RDKP/1516/0006/18-07- 2015 | 4 | 1200 |
4 | Vernier Caliper | 1 | RDKP/1516/0006/18-07- 2015 | 5 | 1700 |
5 | Depth Vernier Caliper | 1 | RDKP/1516/0006/18-07- 2015 | 6 | 2500 |
6 | Outside Micrometer | 1 | RDKP/1516/0006/18-07- 2015 | 7 | 1700 |
7 | Adjustable Snap Gauge | 1 | RDKP/1516/0006/18-07- 2015 | 8 | 2200 |
8 | Plunger | 1 | RDKP/1516/0006/18-07- 2015 | 9 | 1700 |
9 | Universal Level Protactor | 1 | RDKP/1516/0006/18-07- 2015 | 10 | 3000 |
10 | Flexible Dial Stand | 1 | RDKP/1516/0006/18-07- 2015 | 11 | 2400 |
11 | Screw Thread Micrometer | 1 | RDKP/1516/0006/18-07- 2015 | 12 | 4500 |
12 | Gear Tooth Vernier Calliper | 1 | RDKP/1516/0006/18-07- 2015 | 13 | 5500 |
13 | Sine Bar | 1 | RDKP/1516/0006/18-07- 2015 | 14 | 4800 |
14 | Mechanical Comparator Stand Base | 1 | RDKP/1516/0006/18-07- 2015 | 15 | 8500 |
15 | Vernier Height Gauge | 1 | RDKP/1516/0006/18-07- 2015 | 16 | 12000 |
16 | Steel Slip Gauge Set | 1 | RDKP/1516/0006/18-07- 2015 | 17 | 48000 |
17 | Profile Projector Model | 1 | RDKP/1516/0006/18-07- 2015 | 18 | 145000 |
18 | Auto-Collimator | 1 | RDKP/1516/0006/18-07- 2015 | 19 | 115000 |
19 | Pneumatic Comparator | 1 | RDKP/1516/0006/18-07- 2015 | 20 | 49000 |
TOTAL COST | 4,11,100/- |
NAME OF LAB: | INDUSTRIAL FLUID POWER LAB |
NAME OF LAB INCHARGE: | Mr.Waghmare V.P |
NAME OF TECHNICAL ASSISTANT: | Mr Suryawanshi Rohan |
TOTAL COST OF LAB: | 1,97,625/- |
CARPET AREA: | 66 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Electro-Hydraulic Trainer | 1 | 40/18/01/2016 | 10 | 1,36,000 |
2 | Electro Pneumatic Trainer | 1 | 40/18/01/2016 | 11 | 61,625 |
TOTAL COST | 1,97,625/- |
NAME OF LAB: | AUTOMOBILE ENGINEERING LAB |
NAME OF LAB INCHARGE: | Mr. Magar A L |
NAME OF TECHNICAL ASSISTANT: | Mr Mulani A M |
TOTAL COST OF LAB: | 1,97,625/- |
CARPET AREA: | 66 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Differential Assembly With Axle | 1 | 1055/01-08-2015 | 1 | 2500 |
2 | Engine Assembly MPFI | 1 | 1055/01-08-2015 | 2 | 4500 |
3 | Gear Box Assembly m/van | 1 | 1055/01-08-2015 | 3 | 3000 |
4 | Leaf Spring | 2 | 1055/01-08-2015 | 4 | 1000 |
5 | Turbo Jet Engine Assembly With CR4 Gearbox | 1 | 1055/01-08-2015 | 5 | 11500 |
6 | Break System | 1 | 1055/01-08-2015 | 6 | 2500 |
7 | Automobile Tool Kit | 5 | 215/25/07/2016 | 7 | 6610 |
TOTAL COST | 31610/- |
NAME OF LAB: | POWER ENGINEERING LAB |
NAME OF LAB INCHARGE: | Mr.Waghmare V P |
NAME OF TECHNICAL ASSISTANT: | Mr Wangaskar R U |
TOTAL COST OF LAB: | 1,96,870/- |
CARPET AREA: | 66 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Morse Test Rig | 1 | 2261/15-07-2015 | 1 | 85,500 |
2 | Air Compressor Test Rig | 1 | 2261/15-07-2015 | 2 | 47,520 |
3 | Refrigeration Test Rig | 1 | 2261/15-07-2015 | 3 | 53,550 |
4 | Model of Air Conditioner | 1 | 1003/07-08-2014 | 4 | 4800 |
5 | Model of Refrigerator | 1 | 1003/10-09-2014 | 5 | 5500 |
TOTAL COST | 1,96,870 |
NAME OF LAB: | MECHANICAL ENGINEERING MATERIALS LAB |
NAME OF LAB INCHARGE: | Mr.Rathod Y S |
NAME OF TECHNICAL ASSISTANT: | Mr Wangaskar R U |
TOTAL COST OF LAB: | 1,83,120/- |
CARPET AREA: | 66 Sqm. |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Single Disc Polisher | 1 | EMSS/18-19/101,10/09/2018 | 1 | 26,460/- |
2 | Muffle Furnace | 1 | EMSS/18-19/101,10/09/2018 | 2 | 51,660/- |
3 | Binocular Mettalurgical Microscope | 1 | EMSS/18-19/101,10/09/2018 | 3 | 37,800/- |
4 | Rockweel Cum Brillness Hardness Tester | 1 | EMSS/18-19/101,10/09/2018 | 4 | 67,200/- |
TOTAL COST | 1,83,120/- |
NAME OF LAB: | WORKSHOP |
NAME OF LAB INCHARGE: | Mr. WAGHMARE V.P |
NAME OF TECHNICAL ASSISTANT: | MR. KHANDADE S.S. |
TOTAL COST OF LAB: | 27,44,648 /- |
CARPET AREA: | 320 Sqm |
Sr.No | Particulars | Quantity | Bill No/Date | DSR Page No | Cost |
1 | Lathe Machines | 8 | R-27/12-09-2014, R-70/ 19-02-2017 | 40 | 11,82,400 |
2 | Radial Drill Machine | 1 | R28/12-09-2014 | 41 | 64,500/- |
3 | Pillar Drill Machine | 1 | R28/12-09-2014 | 42 | 32,000/ |
4 | Power Hacksaw Machine | 1 | R29/12-09-2014 | 43 | 55,500 |
5 | Shaper Machine | 1 | R28/12-09-2014 | 44 | 1,25000/- |
6 | Workshop Machine Accessories | 22 | 1016/22-02-2014 | 45 | 19,992 |
7 | CNC Lathe Trainer (VLM-T-100) | 1 | 09/10-10-2015 | 46 | 5,40,000 |
8 | Open Hearth Furnace | 1 | 1421/09-01-2015 | 47 | 24,500 |
9 | Anvil | 1 | 1423/07-04-2015 | 48 | 8,500 |
10 | Chap Saw | 1 | 1423/07-04-2015 | 49 | 9,500 |
11 | Milling Machine | 1 | R-41/19-02-2017 | 50 | 2,65,000 |
TOTAL COST | 23,26,892/- |